Aeroseal FAQ: Project Wrap Up & Guarantee
Aeroseal’s commercial team recently wrapped up its FAQ webinar series to walk through the most common questions mechanical contractors and ESCOs across the nation have about Aeroseal’s duct sealing technology.
April Frakes, Director of Commercial Business Development, was joined by John Harrington, Director of Application Engineering, and Jake Smith, Director of Commercial Field Operations for the sixth and final webinar in the Commercial FAQ series. The team talked through how a project wraps up and how Aeroseal guarantees a project will deliver the results defined in the audit process.
Aeroseal’s Project Guarantee
At the beginning of a project, Aeroseal estimates duct leakage reduction rates to predict the project’s energy savings. These estimated energy savings are more than just a number – they are guaranteed results. Even if the team has to seal additional ductwork systems, they always meet the estimated leakage reduction. This ensures the duct sealing results are in alignment with the project’s overall energy savings.
“We test before, during, and after the project to confirm leak reduction,” said Frakes. “These tests use standard tools and certified processes to confirm duct leak reduction.”
The Turnkey Solution
Testing is a critical part of Aeroseal’s four-phase approach to assessing and meeting a project’s needs.
- Audit & Evaluate
- Test & Plan
- Repair, Clean, Sanitize & Seal
- Measure & Verify
To learn more about Aeroseal and its project guarantees, including the webinar’s active Q&A session, watch the full-length recording below. And click here to check out the rest of the webinar series.