STEP 1
• Cover finished horizontal surfaces
• Cover openings that should not be sealed
• Set up equipment
STEP 2
• Pressurize space and establish baseline leakage
• Input your target ACH50 rating
• Begin injection of aerosolized AeroBarrier Sealant via AeroBarrier Software
STEP 3
• Monitor sealing progress via Aerobarrier software
• Track and report progress every 10 second via continuous blower door test
• Verify sealing to required ACH50 target
STEP 4
• Generate Envelope Sealing Report via AeroBarrier software
• Remove protective coverings and equipment
• Resume construction work within 30 minutes
STEP 1
STEP 2
STEP 3
STEP 4